I know it's hard to see, but here is the foundation as it sits. The pink parts are the old basement walls, the grey is the new crawlspace. Now you can finally see just how much we added on.
Friday, August 31, 2012
Demo is done!
Woo hoo! Demolition is completely done! The rest of the old floor deck was removed little by little by DH over the week. The wall separating the old basement with the new crawlspace has been removed. Even part of the dirt we removed has been pushed back down. Now, we start CONSTRUCTION! The next thing that will happen is the new floor deck going on. Then the walls will go up. So, the next three weeks are going to see a LOT of progress! I can't wait!
Wednesday, August 22, 2012
We've got block!
Woo hoo! We've officially got a whole foundation for the house now. The block guys came yesterday to drop off the block, then today to lay the block for the crawlspace. Next is pouring the concrete into the basement walls to strengthen them. Then we remove the rest of the floor deck. From there, it's ALL construction instead of demolition. Woo hoo!
The block truck.
It had it's own crane onboard to unload them!
All of our block for the foundation.
The block is laid!
There we go! Now you can sort of see how big the addition to the main house is. :)
Wednesday, August 15, 2012
Basement walls
Today DH and MD shored up the basement walls in preparation for rebar and concrete to be poured into them to help stabilize them. Then, they started tearing off the floor deck. The plan is to finish tearing off the floor deck on Friday. Block guy for the crawlspace foundation will be here sometime next week!
See! Part of the floor deck has been taken off. DH is going to try to salvage the hardwood flooring to use in a different project later on.
Yeah. The block was really really loose. Good thing this wall is going to be removed.
See how they braced the wall in preparation for the rebar and concrete! And yes, this is standing on the concrete pad, looking through the wall into the basement.
Tuesday, August 7, 2012
We've got concrete!
Woo hoo. The concrete company came at 8 o'clock this morning. By 8:45am, when I showed up, they had half of the pad poured and were smoothing it out. By 11 o'clock, they were gone. They were fast and amazing. Now, we'll let it dry for a few days before we move on to the next step. That will be either laying the block for the walls for the crawlspace -or- removing the floor deck to shore up the basement walls. One of the other will happen in a few days.
The cement truck
Half of it poured and being smoothed.
All done!
Monday, August 6, 2012
Framework
Well, it took longer than we thought to do, but the frame for the concrete slab is finally done. Levelling the pad for concrete had to be hand-dug. So it took many more hours than we thought. Then, on Sunday, we had torrential rains that held up progress. Today, DH finished the final things to get the dirt slab ready for tomorrow's concrete pour!
Friday, August 3, 2012
Excavation Day Two
Today's pictures aren't as impressive as yesterday's, however we did get a lot of work done. We put in the drainage pipe and excavated the whole new addition area. Oh, we also broke my Dad's dump truck. Tomorrow we'll be putting the framework in for the concrete slab of the crawlspace. The slab will be poured on Tuesday. The foundation will also be shored up on Tuesday. So, Sunday and Monday will be rest days. Yay. Days of rest!
MD and DH putting in the drainage pipe.
DH standing in the hole that will be the crawlspace for the new addition.
Here's what the 'house' looks like now. That's 8 feet of the basement wall you can see here.
And here is the mound of dirt lining the property. Why? Remember how I said the dump truck broke? Yeah. That's why. We can't remove the dirt from the property because of the dump truck being broke.
This is no little pile of dirt either. LMS is 4'6" tall and it's as tall as she is. It extends the full length of the property too. Insane.
Thursday, August 2, 2012
Excavation Day 1
Yes, I said Day One. You'll see why later. Anyway, today started off amazing. I was truly astonished at how fast things went today. In fact, the pictures will do all the story.
How the house looked when we began the day. It didn't stay like this for long.
The excavator!
There goes part of the rest of the house!
Boom!
And there goes the rest!
Smash. No more house.
DH working down in the trench next to the basement. It's deep. We have some foundation work we need to do, which is why we're digging around the foundation.
And this is why there is a Day One. The track came off the excavator. 15 mins AFTER the place closed for the day. Isn't that how it always goes? The plan now is to finish excavation tomorrow, after the people come and fix the track. Then, we're off and running on construction!