Showing posts with label drywall. Show all posts
Showing posts with label drywall. Show all posts

Thursday, April 18, 2013

Drywall is done.

As you can see, the bedrooms are completely drywalled and mudding has begun. The only thing not finished having drywall hung is the kids' bathroom. We have to do some minor framing work in order to finish the bathroom. 



This is how she looks today with both windows on the front in and the front door door installed.

Monday, April 1, 2013

More drywall installation

Yes, a DIY house rebuild takes forever. However, it also saves money. Lots of money. This is where we are currently on the drywall installation.
The hallway

Kid Room

Master Bedroom

Master Closet

Another Kid Room

Master Bathroom

The pit to the basement. This was entertaining watching the drywall be hung.

Saturday, March 23, 2013

Drywall installation begins

Some of the posts I'll make are going to be primarily pictures only. This is one of them.
Part of the living room

Living room ceiling

Master Bedroom

One of the kids' rooms

Drywall was delivered

The drywall for the entire house was delivered today. It was so worth the money spent to have them deliver it and bring it into the house. Drywall is NOT light. My knees and back are thanking my wallet today.
Yes, that's all our drywall. Yes, they used a crane to bring it into the house. The entire delivery took about 45 mins. It would have taken us SEVERAL trips and SEVERAL hours to do this. Again, definitely worth the delivery fee.
As you can see, the drywall process has begun. Our first few sheets are up. These are 4x12 sheets too.